| Description | Docketed “Enclosing letter from Danube Co. The light pair of 30 horse engines will leave about end of next week. Also propose sending two more boat loads of Sclessin materials immediately. Do not understand Meteor’s boiler affair. Myrtle’s boiler must wait making the copper connecting pipes. Richards has discovered error in the length of the after part of Danube boiler No. 14. Note what I say about 38 horse cylinder. Gleaner’s boiler ready in about a month.” |