| Description | Not summarised. [The estimate cannot be fully completed in the absence of the principals. It is usual to supply a boiler. They cannot undertake the erection but usually send an experienced workman to direct and assist. If the water works assent on these two points the estimate can be prepared.] On the same sheet: Transcript of letter. Thomas Wright (Birmingham) to Boulton Watt & Co. 30 Jun. 1830. Not summarised [The directors assent to the two points in Boulton Watt & Co.’s letter.] |