| Description | Docketed “Proceedings with Col. Twent. 140 horses proposed, ship built in the Thames – estimate given. 11d per lb. offered for Sovereign’s boiler. Dr. Verdeil’s drawings not ready. Navy orders for 50 horse engines to be ready in 15 months. Navy disposal of 40 horse engines considering.” |