| Description | The docket is on a separate sheet, which has been attached to the letter. Docketed “On the complaints made by the agent at Holyhead. Sillem & Grantoff require time for delivery of Caledonia boiler not to exceed 6th Oct. Sends copies of correspondence with Lunell & Co. Drawings of Lambeth Water Works received. The Borough likely to have an engine of same power. Comet to have additional stays to beams to remove the shake. Considerations about raising the shafts of Comet.” |